Tuesday, March 05, 2013

A belated update of sorts

So, it's been a while since I posted a blog update.  Here goes:


  • I upgraded the RAM in my 13" MacBook Pro from 4GB to 16GB (purchased from http://www.macfixit.com.au).  The performance boost is nice.
  • The cubby house I am building for the kids is progressing well.  I am looking forward to the first round of bulk rubbish collections in the area for the year so I can stock up on some supplies (mainly Colorbond offcuts and wood).
  • The computer collection received two new additions - an SE/30 and a PowerMac 7600.  Both are used but came in their boxes including all peripherals, cables and documentation.  Two very nice Macs.
  • The N gauge model train collection and layouts are progressing well.  Recent additions include some old Graham Farish Class 43 HSTs, a new Dapol Class 58 and numerous rolling stock items.  I am in the process of planning a small 400 x 1200 mm layout as space in the Howell residence is becoming a little tight (see below for the planned layout).
400 x 1200 mm Layout Plan

  • I purchased an iPad Mini (16GB, WiFi+3G, White).  I am finding it a very convenient size.  This is my iPad, the children have claimed the other iPad (3rd Gen iPad, 16GB, WiFi, Black) for YouTube, ABC iView etc.

No comments: